Automatic Farm
Ву 2:00 AM.
Building and Item Requirements
The building should be a barn or a bungalow.

Required Items:
- 15 Large Storage Racks

- 8 Drying Racks

- 16 Suspension Racks
- 16 Full Spectrum Grow Lights
- 16 Pots

- 10 Beds
- 2 Cauldrons

- 2 Lab Ovens

- 3 to 9 Brick Presses

- 8 Mixin Station MK2

Staff and Equipment
Storage:
- All storage units are large.
Botanists (3):
- Two botanists manage 16 plant pots. Plant products from these pots are sent to eight drying racks.
- One botanist manages the eight drying racks. Half of the dried products are sent to one storage unit, and the other half to a different storage unit.
- Handlers then move these dried products to two cauldrons.



Chemists (4):
- Two chemists operate two cauldrons and two ovens, in that order.
- Two chemists operate eight mixers. The mixers are set to transfer ingredients in the correct sequence, ending at a drill press.




Handlers (3):
- Handlers manage up to nine drill presses (three are sufficient), and these drill presses send items to storage.
- Handler routes:
- Move dried leaves from two storage units to the cauldrons.
- Move gas from two storage units to the cauldrons.
- Move mixed ingredients from eight shelves to the mixers, following the mixing sequence. A total of twelve routes are needed for full automation, excluding shelf restocking.



Important Notes
- Handlers can manage brick presses. You can assign up to three brick presses per handler.
- Map out the entire mixing process, showing the order in which ingredients move between mixing stations.
- Decide where the final mixing station sends its output. Options include storage, a brick press, or leaving it in the station (in which case handlers must move it).
- Pay employee salaries promptly.
- Keep resources stocked.
Be the first to comment